Foundation completed

Well not really but all the pieces are there now, the slab foundation has been poured. The foundation still has to be waterproofed and the foundation wall backfilled.  With the slab foundation in place you can tell how high the raised floor portion of the house will be. The bottom of the steel beam is where the ceiling will be. Some will consider our ceiling to be low at 8 ft.

slab.jpg

Next comes the noisy part, framing, with lots of hammering. Unfortunately for the neighbors, the house next door, which has been vacant for at least a year (I’m guessing speculative flipping that got into trouble), have also started remodeling so the noise level is going to be pretty high.

This entry was posted in construction, foundation. Bookmark the permalink.

4 Responses to Foundation completed

  1. つくですが says:

    ワビハウスの完成予定っていつ?新しいお風呂でうどんを食べると、痛風にならないんだよ。

  2. 妻ですが says:

    年内はまず無理だろうな。6ヶ月から8ヶ月って言われて、6月ごろから始まったからねー。風呂桶にうどん浮かべて食べんの?きたねーなあ。

  3. つくですが says:

    違うよ。どんべぇを持込んでいいんだよ。9月って何日頃来る?

  4. 妻ですが says:

    すっぽんぽんで「どんべえ」?それもおかしいねー。9月ねー、いつ来てほしい?

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s